Download Comprehensive Tariff Sheet

Clark Electric has several rates for our members. Please look these over and see if you may qualify for one of them. Clark Electric Appliance & Satellite can help you in putting the right electric heating system in your house. We install and offer electric heating systems and other full service. And finding those incentives for you is a priority.

This page is a summary of charges and services. Be sure to read the tariff sheet for all the information about a given rate schedule

Single Phase Service, Village (Rate 58) - Schedule A

Single phase, alternating current, at available secondary voltages. Available to members residing in high density (incorporated Village/City) of at least 10 consumers per mile and average monthly usage exceeding 500 kWh's per location.

Monthly Rate

Transformer Size: 10 KVA or less

$13.20/month Facility Charge

Transformer Size: 15 & 25 KVA

$24/month Facility Charge

Transformer Size: 37-1/2 KVA & Greater

$29/month Facility Charge

Energy Charge

$.0925 per kWh

View Tariff Sheet

Single Phase Service (Rate 78,80,88) - Schedule A

Single phase alternating current, at available secondary voltages.

Monthly Rate

Transformer Size: 10 KVA or less

$20/month Facility Charge

Transformer Size: 15 & 25 KVA

$24/month Facility Charge

Transformer Size: 37-1/2 KVA & Greater

$29/month Facility Charge

Energy Charge

$0.0925 per kWh

View Tariff Sheet

Primary (Rate Code 63) - Schedule LP

Three-phase, alternating current, at available standard voltages.

Facility Charge

$70.00/Month

Energy Charge

$0.0535 per kWh pluse Power Cost Adjustment. Primary metering service energy shall be reduced 2% (before energy charge).

Demand Charge

 

On Peak Hours 5:30 AM - 8:30 AM

$8.50 per month per kilowatt

Off Peak Hours (anything not included above)

$1.30 per KW

View Tariff Sheet

Controlled Electric Heat - Schedule A-C

Single-phase, alternating current, at available secondary voltages. Available when used in conjunction with Schedule A.

Facility Charge

$4.00 per month

Energy Charge

$0.0925 per kWh for consumption in June, July, and August. Discounted all other months.

View Tariff Sheet

Heat Storage (Rate Code 73) - Schedule A-HS

Single phase alternating current, at available secondary voltages. Available when used in conjunction with any other rate schedule.

Facility Charge

$4.00 Facility Charge

Energy Charge

$0.0925 per kWh less $0.049 per kWh discounted for Sept. thru May consumption.

$0.0925 kWh will be the energy rate applicable for energy consumption for the months of June, July, and Aug. Discounted all other months.

View Tariff Sheet

Controlled Heating and Air Conditioning (Rate Code 74) - Schedule A-IAC

Single phase alternating current, at available secondary voltages. Available when used in conjunction with Schedule A and with electric heat.

Facility Charge

$4.00/Month

Energy Charge

 

$.0925 per kWh less $0.033 per kWh (Power used from May to Sept; less $0.049 per kWh all other months.)

Summer months (May, June, July, Aug, Sept):

$0.0595 per kWh

Winter Months (all remaining months)

$0.0435 per kWh

View Tariff Sheet

Single Phase, Time of Day (Rate 71, 72) - Schedule A-TD

Single phase, alternating current, at available secondary voltages.

Monthly Rates

Transformer Size: 10 KVA or less

$20/month Facility Charge

Transformer Size: 15 & 25 KVA

$24/month Facility Charge

Transformer Size: 37-1/2 KVA & Greater

$29/month Facility Charge

Energy Charge

On Peak Hours 6:30 AM - 9:30 AM and 5:30 PM - 9:30 PM

$.1425 per kWh

Off Peak Hours (anything not included above)

$.0525 per kWh

View Tariff Sheet

Rural Three Phase Power (Rate Code 79) - Schedule B

Three phase, alternating current at available secondary voltages.

Facility Charge

$45.00 per month

Energy Charge

$0.925 per kWh

View Tariff Sheet

Electric Heat (Rate Code 81,82) - Schedule EH CLOSED

Three phase, alternating current at available secondary voltages. Available to those with special heat rate prior to 7-1-83.

Facility Charge

$4.00 per month

Energy Charge

$0.0780 per kWh

View Tariff Sheet

Large Power Service(Rate Code 83) - Schedule LP

Three phase, alternating current at available secondary voltages.

Facility Charge

$70.00 per month

Energy Charge

$0.0535 per kWh

Demand Charge

 

On Peak Hours 5:30 PM - 8:30 PM daily

$8.50 per month per killowatt

Off Peak Hours (anything not included above)

$1.30 per month per KW

View Tariff Sheet

Large Power, Non-Firm Energy (Rate Code 84) - Schedule LP

Three phase, alternating current at available secondary voltages.

Facility Charge

$70.00 per month

Energy Charge

$0.0535 per kWh

Demand Charge

$1.30 per KW of maximum measured demand.
The billing demand shall be the maximum kilowatt established by the consumer for any consecutive fifteen minute period during the month for which the bill is rendered as indicated, or recorded, by a demand meter.

Demand Charge Penalty

Failure to control demand when signal is sent by Diaryland Power Cooperative will result in the following demand charges.

Winter Months

$25.50 per KW season (Nov - April)

Summer Months

$52.20 per KW season (May - Oct)

View Tariff Sheet

Rate 86 - Schedule GD

Single phase, alternating current, at available secondary voltages. This schedule is available only where grain drying can be controlled through the load management system.

Monthly Rates

Transformer Size: 10 KVA or less

$20/month Facility Charge

Transformer Size: 15 & 25 KVA

$24/month Facility Charge

Transformer Size: 37-1/2 KVA & Greater

$29/month Facility Charge

Energy Charge

$0.0925 per kWh less $0.029 per kWh discount = $0.0635 cost per kWh.

Control Penalty

Failure to control demand when signal is sent by Diaryland Power Cooperative will result in the following demand charges:

Only one penalty charge per season, which being the highest uncontrolled demand during period of load shedding by Dairyland Power Cooperative. Energy charge will also apply during this time.)

Winter Months (Nov - April)

$25.50 per KW per season

Summer Months (May - Oct)

$52.20 per KW per season

View Tariff Sheet

Street Lighting (Rate code 87) - Schedule SL-MV CLOSED

Single-phase, alternating current, at available secondary voltages, 175 watt Mercury Vapor Light.

Monthly Prices

$8.00 per month per light

View Tariff Sheet

Street Lighting (Rate code 87) - Schedule SL-HPS

Single-phase, alternating current, at available secondary voltages, 100, 250, and 400 watt, High Pressure Sodium Light.

Installation Charges

$125.00 (for wood pole) + $50 (for light)

Monthly Prices

 

100 Watt

$7.25 per light

250 Watt

$10.00 per light

400 Watt

$13.50 per light

View Tariff Sheet