Clark Electric has several rates for our members. Please look these over and see if you may qualify for one of them. Clark Electric Appliance & Satellite can help you in putting the right electric heating system in your house. We install and offer electric heating systems and other full service. And finding those incentives for you is a priority.
This page is a summary of charges and services. Be sure to read the tariff sheet for all the information about a given rate schedule
Single Phase Service, Village (Rate 58) - Schedule A |
|
Single phase, alternating current, at available secondary voltages. Available to members residing in high density (incorporated Village/City) of at least 10 consumers per mile and average monthly usage exceeding 500 kWh's per location. |
|
Monthly Rate |
|
Transformer Size: 10 KVA or less |
$13.20/month Facility Charge |
Transformer Size: 15 & 25 KVA |
$24/month Facility Charge |
Transformer Size: 37-1/2 KVA & Greater |
$29/month Facility Charge |
Energy Charge |
$.0925 per kWh |
Single Phase Service (Rate 78,80,88) - Schedule A |
|
Single phase alternating current, at available secondary voltages. |
|
Monthly Rate |
|
Transformer Size: 10 KVA or less |
$20/month Facility Charge |
Transformer Size: 15 & 25 KVA |
$24/month Facility Charge |
Transformer Size: 37-1/2 KVA & Greater |
$29/month Facility Charge |
Energy Charge |
$0.0925 per kWh |
Primary (Rate Code 63) - Schedule LP |
|
Three-phase, alternating current, at available standard voltages. |
|
Facility Charge |
$70.00/Month |
Energy Charge |
$0.0535 per kWh pluse Power Cost Adjustment. Primary metering service energy shall be reduced 2% (before energy charge). |
Demand Charge |
|
On Peak Hours 5:30 AM - 8:30 AM |
$8.50 per month per kilowatt |
Off Peak Hours (anything not included above) |
$1.30 per KW |
Controlled Electric Heat - Schedule A-C |
|
Single-phase, alternating current, at available secondary voltages. Available when used in conjunction with Schedule A. |
|
Facility Charge |
$4.00 per month |
Energy Charge |
$0.0925 per kWh for consumption in June, July, and August. Discounted all other months. |
Heat Storage (Rate Code 73) - Schedule A-HS |
|
Single phase alternating current, at available secondary voltages. Available when used in conjunction with any other rate schedule. |
|
Facility Charge |
$4.00 Facility Charge |
Energy Charge |
$0.0925 per kWh less $0.049 per kWh discounted for Sept. thru May consumption. |
Controlled Heating and Air Conditioning (Rate Code 74) - Schedule A-IAC |
|
Single phase alternating current, at available secondary voltages. Available when used in conjunction with Schedule A and with electric heat. |
|
Facility Charge |
$4.00/Month |
Energy Charge |
|
|
$.0925 per kWh less $0.033 per kWh (Power used from May to Sept; less $0.049 per kWh all other months.) |
Summer months (May, June, July, Aug, Sept): |
$0.0595 per kWh |
Winter Months (all remaining months) |
$0.0435 per kWh |
Single Phase, Time of Day (Rate 71, 72) - Schedule A-TD |
|
Single phase, alternating current, at available secondary voltages. |
|
Monthly Rates |
|
Transformer Size: 10 KVA or less |
$20/month Facility Charge |
Transformer Size: 15 & 25 KVA |
$24/month Facility Charge |
Transformer Size: 37-1/2 KVA & Greater |
$29/month Facility Charge |
Energy Charge |
|
On Peak Hours 6:30 AM - 9:30 AM and 5:30 PM - 9:30 PM |
$.1425 per kWh |
Off Peak Hours (anything not included above) |
$.0525 per kWh |
Rural Three Phase Power (Rate Code 79) - Schedule B |
|
Three phase, alternating current at available secondary voltages. |
|
Facility Charge |
$45.00 per month |
Energy Charge |
$0.925 per kWh |
Electric Heat (Rate Code 81,82) - Schedule EH CLOSED |
|
Three phase, alternating current at available secondary voltages. Available to those with special heat rate prior to 7-1-83. |
|
Facility Charge |
$4.00 per month |
Energy Charge |
$0.0780 per kWh |
Large Power Service(Rate Code 83) - Schedule LP |
|
Three phase, alternating current at available secondary voltages. |
|
Facility Charge |
$70.00 per month |
Energy Charge |
$0.0535 per kWh |
Demand Charge |
|
On Peak Hours 5:30 PM - 8:30 PM daily |
$8.50 per month per killowatt |
Off Peak Hours (anything not included above) |
$1.30 per month per KW |
Large Power, Non-Firm Energy (Rate Code 84) - Schedule LP |
|
Three phase, alternating current at available secondary voltages. |
|
Facility Charge |
$70.00 per month |
Energy Charge |
$0.0535 per kWh |
Demand Charge |
$1.30 per KW of maximum measured demand. |
Demand Charge Penalty |
Failure to control demand when signal is sent by Diaryland Power Cooperative will result in the following demand charges. |
Winter Months |
$25.50 per KW season (Nov - April) |
Summer Months |
$52.20 per KW season (May - Oct) |
Rate 86 - Schedule GD |
|
Single phase, alternating current, at available secondary voltages. This schedule is available only where grain drying can be controlled through the load management system. |
|
Monthly Rates |
|
Transformer Size: 10 KVA or less |
$20/month Facility Charge |
Transformer Size: 15 & 25 KVA |
$24/month Facility Charge |
Transformer Size: 37-1/2 KVA & Greater |
$29/month Facility Charge |
Energy Charge |
$0.0925 per kWh less $0.029 per kWh discount = $0.0635 cost per kWh. |
Control Penalty |
Failure to control demand when signal is sent by Diaryland Power Cooperative will result in the following demand charges: Only one penalty charge per season, which being the highest uncontrolled demand during period of load shedding by Dairyland Power Cooperative. Energy charge will also apply during this time.) |
Winter Months (Nov - April) |
$25.50 per KW per season |
Summer Months (May - Oct) |
$52.20 per KW per season |
Street Lighting (Rate code 87) - Schedule SL-MV CLOSED |
|
Single-phase, alternating current, at available secondary voltages, 175 watt Mercury Vapor Light. |
|
Monthly Prices |
$8.00 per month per light |
Street Lighting (Rate code 87) - Schedule SL-HPS |
|
Single-phase, alternating current, at available secondary voltages, 100, 250, and 400 watt, High Pressure Sodium Light. |
|
Installation Charges |
$125.00 (for wood pole) + $50 (for light) |
Monthly Prices |
|
100 Watt |
$7.25 per light |
250 Watt |
$10.00 per light |
400 Watt |
$13.50 per light |